Case Study
Shell Adopts Global Supply Chain Process to Increase Profitability and Drive an “Enterprise First” Strategy
After the company identified uncommon operating procedures at each of its many refineries — which led to inefficiencies and lower margins — Shell launched “Enterprise First,” an initiative designed to standardize processes and technology across the organization. The key to driving this strategy — and meeting its objectives — is an integrated aspenONE® Supply Chain Management solution that helps Shell optimize refinery production, reduce costs and increase margin.
Video
Aspen Mtell for Metals & Mining: What is an Agent?
Aspen Mtell is a prescriptive maintenance solution that uses Agents to recognize asset failures earlier and with greater accuracy. View this video to learn what an Agent is, what they do, how they are created and how they work—to safeguard equipment, people and the environment.
Brochure
Aspen Utilities OnLine Optimizer
Aspen Utilities OnLine Optimizer is an integrated software solution that enables process plant operators to manage and optimize the way they use and source energy in the power station and across an entire production site. In this brochure you will learn how it enables companies to ensure that all their processes receive reliable supplies, while at the same time minimizing running costs by reducing overall consumption and identifying the most economical sources of supply.
Case Study
Next Generation of APC Delivers Benefits for Ethylene Manufacturer
Learn how Qenos, an Austrailian ethylene manufacturer, used Aspen DMC3 to revamp a demethaniser controller with very limited resources and achieved a 5-10% increase in cold end throughput, a 40% reduction in variability in overhead methane, and a 20% reduction in tower dP.
Case Study
Braskem Implements Aspen DMC3 to Deploy Controllers in Just Two Weeks and Immediately Accrues Benefits
Braskem is the largest petrochemical company in Latin America, the leading producer of polypropylene in the United States, and the eighth-largest resin producer worldwide. Braskem used Adaptive Process Control within Aspen DMC3 to deploy controllers in just two weeks to start accruing benefits immediately. The benefits included lowered energy usage by 20%, increased production rates and reduced process variability. Download this case study today to learn more about the benefits Braskem realized by using Aspen DMC3 and discover how to achieve these benefits at your organization.
Case Study
GlaxoSmithKline Speeds up Batch Release Time: A Study in Digital Transformation
GlaxoSmithKline (GSK) wanted to review the structure of its batch production record and associated workflows as part of a continuous improvement process. Reducing batch review time usually results in faster batch cycle time, meaning higher throughput at the production facility and faster cash-to-cash cycle time. AspenTech was selected for this process due to integration with other solutions, such as Aspen InfoPlus.21® and GSK’s existing plant automation software (DCS). The pilot project was a resounding success, reducing order preparation time by 95% and record review time by over 50%.
Page 146 of 160