Case Study

日本の製薬会社がAspen Plus®で 品質改善を実現

日本に本社を置き、創業から140年の歴史を誇るグローバル製薬会社がAspen Plusを導入して新規原薬(API)の合成を改善しました。同社は、創薬に重点を置きながら医薬品や医療機器の研究開発から製造、販売まで行っています。

Case Study

Digital Supply Chain Helps FPCO Reduce Emissions and Waste, Meet Sustainability Goals

FP Corporation (FPCO) is Japan’s largest manufacturer of food containers and a logistics service provider delivering a range of products to stores engaged in food distribution. They needed to provide stable and responsive food distribution in an efficient and environmentally friendly way.

Case Study

Digital Transformation with Predictive Maintenance Drives Cost Savings

When this large energy company launched its digital transformation initiative, it turned to Aspen Mtell® to execute an online predictive maintenance pilot on a hydrogen compressor.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

Liquid Light Achieves Process Simplification and Reduces Costs

In order to meet their design need of maintaining a 25% cost advantage over conventional chemical processes, the engineers at Liquid Light needed a flexible software solution to find key property data (even for non-ideal and electrolyte systems), conduct “what-if” and case analyses, model reaction systems, select solvents, and scale-up quickly and reliably. Leveraging Aspen Plus and Aspen Properties, the members of Liquid Light have been able to make meaningful predictions about system behavior, moving them closer to full scale production.

Case Study

Maturus Optimi Gets Out of the Gate Fast

Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Executive Brief

将意外停机转变为计划停机,以最大限度地提高安全性、可持续性和生产率

意外停机影响广泛,所波及的不仅仅是工厂的生产率和盈利能力。强制关机还会对工厂和人员安全、温室气体排放和环境合规产生重大影响。但是,如果你真的可以计划停机时间呢?在本文中,我们将了解机器学习和预测分析的进步如何消除意外停机,使公司最大限度地减少最危险的情况,减少排放到环境中的气体量,提高生产率和盈利能力。

Executive Brief

Executive Brief: The Time is Right for Optimum Reliability

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing a year’s worth of hard-fought optimization value in just two to three days due to a maintenance emergency. Through the science of maintenance, historical and real-time operational data combine to predict when a breakdown will occur with months — not just days — of advance notice.

Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Page 38 of 160