In a project in an urban environment restricted by limited surface drilling locations, a reliable development plan was needed to economically access gas condensate reserves, addressing all trajectory and engineering concerns and producing final well proposals that could be drilled safely, efficiently and successfully.
Read how the Aspen Sysdrill™ application for comprehensive well planning, survey management and drilling engineering was able to demonstrate engineering feasibility for the acreage and generate a full field development plan that effectively removed the previous production limit imposed by restricted surface locations.