This case study details the methodical approach a global supermajor took, utilizing best-in-class technology, to improve production planning in global refineries and chemical plants with Aspen PIMS-AO technology. Based on side-by-side testing of different technologies, Aspen PIMS-AO led to new insights, increased confidence in results and enhanced conversations with traders.
Download this case study to learn how Aspen PIMS-AO allowed this global supermajor to make better decisions resulting in more profitable operations.