Small operational issues in the sulphur recovery unit (SRU) can lead to higher emisisons — or worse, a frustrating and costly shutdown. Simulation of the SRU can enable more reliable operations and fewer shutdowns through the prevention of issues and quick and effective troubleshooting. In this paper, we present three common operational issues and show how simulation was used to prevent or quickly resolve the situation.